A-16

INSTALLATION

A-16

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

STANDARD PANEL INSTALLATION

CONTROL/DISPLAY PANEL

NOTE: Installation Instructions for the standard equipment panels will be required only if you have removed a standard panel and wish to reinstall it.

The Control/Display Panel fits into the upper or mid- dle slots of the Control Box, and is used to adjust WFS, Amps, Voltage, and Trim. It is also the location of the Status indicator, a diagnostic tool provided for system troubleshooting.

Installation is as follows:

1.Turn off power.

2.Remove the two screws from the front of the blank option panel at the location you choose to install your new panel, (top or middle), of the Control Box cabinet. Discard the blank panel or save for future use and save the screws.

3.Tilt the new panel away from the front opening of the Control Box cabinet. Plug the electrical con- nector into the proper connector on the right side of the main printed circuit board (14 pin). Make sure the connector latches in place.

4.Position the new panel, taking care not to dam- age the printed circuit boards on the back and align the screw holes.

5.Replace the two screws and tighten.

CV/GOUGE PANEL

NOTE: Installation Instructions for the standard equipment panels will be required only if you have removed a standard panel and wish to reinstall it.

The CV/Gouge Panel fits into the lower position of the Control Box.

Installation is as follows:

1.Turn off power.

2.Remove the two screws from the front of the Control Box panel. Save the screws, discard the old panel or save for future use.

3.Tilt the new option panel away from the front opening of the Control Box cabinet. Plug the electrical connector into the proper connector on the right side of the main printed circuit board (12 pin). Make sure the connector latches in place.

4.Position the panel to the opening, taking care not to damage the switch connections on the back.

5.Align the screw holes, replace the two screws and tighten.

OPTIONAL PANELS FOR CONTROL BOX

All optional panels for the control box are described in the Accessories section of this manual.

POWER WAVE 455/POWER FEED 10

Page 22
Image 22
Lincoln Electric SVM135-B service manual Standard Panel Installation, CONTROL/DISPLAY Panel, CV/GOUGE Panel