Lucent Technologies Comcode 108678723 manual Final Checklist and Test

Models: Comcode 108678723

1 230
Download 230 pages 18.93 Kb
Page 134
Image 134

DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

5Administering ATM-PNC and ATM-CES

Final Checklist and Test

 

5-36

Table 5-15. ATM-CES installation test procedure

 

 

 

 

 

 

 

 

What to check

How to check

How to fix

 

 

 

 

 

1.Check SONET/SDH layer for status and alarms.

2.Check the LEDs on the ATM circuit packs

3.Temporarily disable any call overflows through administration across each CES trunk group.

4.Ensure CDR records properly, if enabled

5.Verify that ISDN features are working

Refer to the maintenance book for descriptions of the LEDs, their flash rates, and the conditions indicated.

Place test call to any EPN remoted through each signaling group. Make sure call completes and has a 2-way talk path.

Page 134
Image 134
Lucent Technologies Comcode 108678723 manual Final Checklist and Test