Lucent Technologies Comcode 108678723 manual Uucss

Models: Comcode 108678723

1 230
Download 230 pages 18.93 Kb
Page 62
Image 62

DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

3 Installing a DEFINITY ECS ATM-PNC

 

Synchronization Installation and Testing

3-26

 

 

To install a 400A sync splitter between a CSU or DSU/CSU and a DS1 circuit pack, follow the procedures listed in Table 3-13.

Table 3-13. Splitter installation to DS1

Step

Action

Command

Description

 

 

 

 

 

 

1.

Disable

disable

Prevent the system from switching

 

 

synchronization

synchronization

synchronization sources.

 

 

switch

-switch

 

 

 

 

 

 

 

2.

Busyout DS1

busyout board

Busyout the designated DS1 circuit pack.

 

 

circuit pack

UUCSS

 

 

 

 

 

 

 

3.

Remove cable

 

Remove the H600-307 cable from the amphenol

 

 

from DS1

 

connector located on rear of the DS1 circuit

 

 

circuit pack

 

pack.

 

 

 

 

 

 

4.

Attach the

 

Plug the splitter into the same connector just

 

 

splitter

 

vacated by the H600-307 cable.

 

 

 

 

 

 

5.

Reconnect the

 

Plug the H600-307 cable into the connector on

 

 

cable

 

the splitter.

 

 

 

 

 

 

6.

Secure the

 

Secure the splitter to the carrier using the large

 

 

splitter

 

mounting strap removed from a fiber

 

 

 

 

transceiver.

 

 

 

 

 

 

7.

Check

 

Check that all Amphenol connections are

 

 

connections

 

secure.

 

 

 

 

 

 

8.

Release DS1

release board

Restore the designated DS1 circuit pack to

 

 

circuit pack

UUCSS

service.

 

 

 

 

 

 

9.

Test the splitter

 

Use the procedure in ‘‘Splitter port tests

 

 

 

 

(401A/401A only)’’ on page 3-19.

 

 

 

 

Before testing the splitter, insert a modular

 

 

 

 

RJ45 plug into jack J1 and jack J2.

NOTE:

Do not connect port J1 to port J2. Leave the other end of both cords free, because the modular RJ45 plug acts as a opening plug and removes the 100-Ωtermination from J1 and J2 ports.

 

 

After testing is complete, remove the

 

 

opening plugs from J1 and J2.

 

 

 

10.

Check

After about 20 s, all the alarm LEDs on the 316X

 

DSU/CSU

CSU or DSU/CSU should go out.

 

LEDs

If this is the case, perform steps 11 through 12.

 

 

Otherwise, go to step 13.

Page 62
Image 62
Lucent Technologies Comcode 108678723 manual Uucss