DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

3Installing a DEFINITY ECS ATM-PNC

 

Synchronization Installation and Testing

3-31

Table 3-16. Splitter installation to DS1 —

(401A/402A/403A)

 

 

 

 

 

 

Step

Action

Command

Description

 

 

 

 

 

 

11.

Test the splitter

 

Use the procedure in ‘‘Splitter port tests

 

 

 

 

(401A/401A only)’’ on page 3-19.

 

 

 

 

Before testing the splitter, insert a modular

 

 

 

 

 

RJ45 plug into jack J1 and jack J2

 

 

 

 

 

(401A/402A only).

 

 

 

 

 

NOTE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do not connect port J1 to port J2. Leave

 

 

 

 

 

the other end of both cords free, because

 

 

 

 

 

the modular RJ45 plug acts as a opening

 

 

 

 

 

plug and removes the 100-Ωtermination

 

 

 

 

 

from J1 and J2 ports.

 

 

 

 

 

The standard RJ45-to-Bantam test cable

 

 

 

 

 

does not work with the 403A. You need a

 

 

 

 

 

coax-to-Bantam cable or an adapter for

 

 

 

 

 

the RJ45 connector.

 

 

 

 

After testing is complete, remove the

 

 

 

 

 

opening plugs from J1 and J2.

 

 

 

 

 

 

12.

Check the 7

 

After about 20 s, all the alarm LEDs on the DS1

 

 

DS1 LEDs

 

go out and the status 3 LED is steady green.

 

 

 

 

If this is the case, continue. If not, follow the DS1

 

 

 

 

span test procedures in the DEFINITY ECS

 

 

 

 

Maintenance for R8r.

 

 

 

 

 

 

13.

Test the circuit

test board

Verify that the DS1 circuit pack passes Tests

 

 

pack

UUCSS

138 through 146 and 1227. If these tests pass

 

 

 

 

and this is a new installation, continue.

 

 

 

 

If any one of Test 138 through 146 fails, follow

 

 

 

 

the repair procedures in DEFINITY ECS

 

 

 

 

Maintenance for R8r.

 

 

 

 

After clearing all errors, retest the circuit pack.

 

 

 

 

 

 

14.

Run error

list

Wait 15 minutes. Check the error report and

 

 

report

measurements

verify that the DS1 circuit pack is free of any

 

 

 

ds1 summary

To interpret the periodic list measurements

 

 

 

 

UUCSS

report, refer to

 

Page 67
Image 67