Lucent Technologies Comcode 108678723 manual Installing and testing the splitter

Models: Comcode 108678723

1 230
Download 230 pages 18.93 Kb
Page 55
Image 55

DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

3 Installing a DEFINITY ECS ATM-PNC

 

Synchronization Installation and Testing

3-19

 

 

Installing and testing the splitter

The splitter must be installed and tested before the upgrade and cutover. The purpose of testing the splitter is to

Prove that there is enough signal level for the cable length to the ATM switch:

up to 130 ft. (39.65 m) for 400A

within the standard 6 dB allowable loss for 401A, 402A, and 403A (see Table 3-3)

Ensure that the DS1 circuit pack functions properly while receiving the DS1 signal level output from the splitter (Ports J1 and J2 unterminated).

Table 3-7 shows the configurations of the test cable and ports on the sync splitter.

Table 3-7. Cable and port configurations for splitter tests

 

To test

Description

 

 

Port J1

Insert an opening plug into port J2

 

 

 

 

 

 

Port J2

Insert an opening plug into port J1

 

 

 

 

 

 

Maximum output of the splitter

Insert an opening plug into both ports J1 and J2

 

 

to the DS1 circuit pack

 

 

 

 

 

 

Splitter port tests (401A/401A only)

NOTE:

The standard RJ45-to-Bantam test cable does not work with the 403A.

To test the splitter ports J1 or J2, use the procedures in Table 3-8, using the RJ45 to Bantam Test cable from the 1541CC cable kit.

Page 55
Image 55
Lucent Technologies Comcode 108678723 manual Installing and testing the splitter, Splitter port tests 401A/401A only