DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

3 Installing a DEFINITY ECS ATM-PNC

 

Synchronization Installation and Testing

3-17

 

 

Verify the DS1 service

To verify the DS1 service, use the procedure in Table 3-5. Have the ATM switch installer verify the synchronization source.

Table 3-5. T1 or E1 service verification procedure

Step

Action

Command

Description

 

 

 

 

 

 

1.

Check timing

 

Check that the GREEN STATUS 3 LED on the

 

 

signal

 

designated DS1 circuit pack is on steady.

 

 

 

 

 

 

2.

Test the DS1

test board

Test the designated DS1 board.

 

 

circuit pack

UUCSS

If any one of Test 138 through 145 fails, follow the

 

 

 

 

 

 

 

 

repair procedures listed in DEFINITY ECS Maintenance

 

 

 

 

for R8r.

 

 

 

 

 

 

3.

Run error report

list

Verify that the report is free of errors.

 

 

 

measurements

See Table 3-6 to help interpret the report.

 

 

 

ds1 UUCSS

 

 

 

 

 

 

 

summary

 

 

 

 

 

 

 

4.

Identify active

status

Verify that the designated DS1 circuit pack is the active

 

 

synchronization

synchronization

sync source.

 

 

source

 

Note: The DS1circuit pack is not the sync source; it

 

 

 

 

simply shows where the sync splitter is connected.

Page 53
Image 53
Lucent Technologies Comcode 108678723 manual Verify the DS1 service, T1 or E1 service verification procedure