DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

4Upgrading to ATM-PNC

CSS to R8r ATM-PNC

4-4

■Replace the switch node carriers in the PPNs and EPNs

■Reterminate the TDM buses and power up the cabinets

■Install, administer, and cable the ATM interface circuit packs

The following tables have the step-by-step procedures. For critical reliability and ATM network duplication, perform the steps in Table 4-3. For standard and high reliability, perform the steps in Table 4-4. In using the commands in the upgrade tables, type the command and then press Enter.

Page 78
Image 78
Lucent Technologies Comcode 108678723 manual Issue