Lucent Technologies Comcode 108678723 manual Synchronization Installation Testing

Models: Comcode 108678723

1 230
Download 230 pages 18.93 Kb
Page 39
Image 39

DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

3Installing a DEFINITY ECS ATM-PNC

 

 

Synchronization Installation and Testing

3-3

Table 3-1. General installation process

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step

Action

Description

 

 

 

 

 

 

 

 

 

 

 

 

 

7.

Connect the fiber

Connect fiber optic cable to the SC connector on the

 

 

 

 

 

 

optic cables to the

faceplate of each TN2305/TN2306 circuit pack in the

 

 

 

 

 

 

ATM interface circuit

DEFINITY PPN and EPN.

 

 

 

 

 

 

packs

The TN2305/TN2306 circuit pack interface requires SC

 

 

 

 

 

 

 

 

 

connectors (see Note in Step 5).

 

 

 

 

 

 

 

Do not reuse existing fiber cabling with ST connectors

 

 

 

 

 

at both the DEFINITY switch and the ATM switch. This

 

 

 

 

 

requires an ST-to-SC adapter at both ends. It is better

 

 

 

 

 

to order the cable with the SC connectors at both

 

 

 

 

 

 

 

 

ends.

 

 

 

 

 

 

 

 

 

 

 

 

 

8.

Record configuration

Record DEFINITY ECS switch-to-ATM port (port locations

 

 

 

 

 

 

 

for each ATM circuit pack) in Table A-1 (in Appendix A,

 

 

 

 

 

 

 

‘‘Baselining the Customer’s Configuration’’).

 

 

 

 

 

 

 

 

NOTE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Read the MAC addresses from the ATM switch (refer

 

 

 

 

 

to your ATM switch’s quick reference guide) and

 

 

 

 

 

 

 

 

record them in Table A-1.

 

 

 

 

 

 

 

 

 

 

 

 

 

9.

Record fiber

Record the fiber optic cable runs on the lightwave

 

 

 

 

 

 

connections

interface (LIU) diagram (Figure A-1) in Appendix A,

 

 

 

 

 

 

 

‘‘Baselining the Customer’s Configuration’’.

 

 

 

 

 

 

 

 

 

 

 

 

 

10.

Install and test

Follow the procedures for installing and testing the

 

 

 

 

 

 

synchronization

synchronization splitter and the T1 or E1 timing source in

 

 

 

 

 

 

splitter, if required.

‘‘Synchronization Installation and Testing’’ on page 3-.3

 

 

 

 

 

 

 

 

 

 

 

 

Synchronization Installation and

Testing

A DEFINITY ATM-PNC requires network synchronization for DS1 circuit packs not to slip relative to the LEC/IXC switches. The ATM switch serves as the sync reference source for the DEFINITY. The ATM switch, in turn, derives primary and secondary sync. To accomplish this, the most common option is to use synchronization expanders (splitters).

Page 39
Image 39
Lucent Technologies Comcode 108678723 Synchronization Installation Testing, ‘‘Baselining the Customer’s Configuratio n’’