DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

3Installing a DEFINITY ECS ATM-PNC

Equipment Installation

3-1

Installing a DEFINITY ECS

3

ATM-PNC

 

This chapter describes the procedures for installing a new DEFINITY ECS

Release 8 ATM system. The process includes

■Equipment Installation

■Synchronization Installation and Testing

■ATM Network Duplication

Equipment Installation

If the ATM switch and interface circuit packs are already installed, then the actual upgrade to ATM-PNC is done administratively in Chapter 5, ‘‘Administering ATM-PNC and ATM-CES’’.

To prepare for a new DEFINITY ECS ATM installation refer to the following books:

■DEFINITY Enterprise Communications Server Release 8 Installation and Test for Multicarrier Cabinets

■DEFINITY Enterprise Communications Server Release 8 Installation and Test for Single-Carrier Cabinets

Review the reliability configurations for DEFINITY Release 8 ATM (refer to Figure 1-2 through Figure 1-4) and determine the synchronization sources (DS1, E1, or ATM network).

Page 37
Image 37
Lucent Technologies Comcode 108678723 manual Atm-Pnc