DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

3Installing a DEFINITY ECS ATM-PNC

ATM Network Duplication

3-34

 

 

1

2

3

 

 

8

 

4

 

6

9

 

 

7

 

 

 

6

 

 

 

7

 

5

7

 

 

6

 

 

 

 

 

 

10

 

cydasmpx LJK 020100

Figure Notes

1.

DEFINITY ECS PPN1

6.

Fiber connecting ATM switch A to EPNs

2.

Fiber connecting ATM-EI A to ATM switch A

7.

Fiber connecting ATM switch B to EPNs

3.

Fiber connecting ATM-EI B to ATM switch B

8.

DEFINITY ECS EPN1

4.

Lucent ATM switch A

9.

DEFINITY ECS PPN2

5.

Lucent ATM switch B

10.

DEFINITY ECS EPN2

Figure 3-9. EPN configuration with ATM network duplication

Page 70
Image 70
Lucent Technologies Comcode 108678723 manual EPN configuration with ATM network duplication