Table 4-5. Upgrading ATM-PNC from Release 6.3r to Release 8r Critical reliability/ATM network duplication —

 

 

 

 

 

 

Record

More

Site-specific

÷

Step

Action

Command

Description

Time

data

info

comments

 

 

 

 

 

 

 

 

 

 

10.

Busyout connection

busyout atm pnc

Busyout all connections listed in step 8,

 

 

 

 

 

 

 

b-pnc n

beginning with B-PNC EPNs.

 

 

 

 

 

 

 

(connection

 

 

 

 

 

 

 

 

number)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11.

Remove old ATM

 

Remove old, B-PNC TN2238 circuit

 

 

 

 

 

 

circuit packs

 

packs.

 

 

 

 

 

 

 

 

 

NOTE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

First, carefully remove the fiber

 

 

 

 

 

 

 

 

 

 

 

 

 

connections to the ATM circuit

 

 

 

 

 

 

 

 

 

 

 

 

 

packs.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12.

Insert ATM circuit

 

Insert B-PNC TN2305/TN2306 circuit

 

 

 

 

 

 

 

 

 

 

packs

 

packs.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13.

Connect fiber to

 

Physically connect (reterminate) fiber to

 

 

 

 

 

 

 

 

 

 

B-PNC ATM circuit

 

all B-PNC ATM circuit packs

 

 

 

 

 

 

 

 

 

 

packs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14.

Administer ILMI/ESI

change atm pnc n

Change the new ESI (board) address in

Y

Screen 4-2

 

 

 

 

information

(connection

the ESI field for each B-PNC ATM

 

Appendix A,

 

 

 

 

 

number)

circuit pack.

 

 

 

 

 

 

‘‘Baselining

 

 

 

 

 

Query the ATM switch. Read the

 

 

 

 

 

 

 

the

 

 

 

 

 

 

 

address information from the terminal

 

 

 

 

 

 

 

Customer’s

 

 

 

 

 

 

screen and duplicate in the DEFINITY

 

 

 

 

 

 

 

Configuration’’

 

 

 

 

 

ECS switch administration or on the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

worksheet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15.

Verify circuit pack

list configuration

Ensure that all new B-PNC ATM circuit

 

 

 

 

 

 

 

 

 

 

insertion

atm

packs are listed in the report.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16.

Release atm

release atm pnc

Release all of the atm connections that

 

 

 

 

 

 

 

 

 

 

connection

b-pnc n

were busied out in step 9.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

17.

Release the standby

release

Release the standby PNC before

 

 

 

 

 

 

 

 

 

 

PNC

pnc-standby

making any physical connections.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18.

Check link

list sys-link

Ensure that the PACLs (all PNs) and

 

Screen 4-8

 

 

 

administration

 

EALs (all EPNs) are up.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 Upgrading to ATM-PNC R7r ATM-PNC to R8r ATM-PNC

DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124

4-16

Issue 1 April 2000

Page 90
Image 90
Lucent Technologies Comcode 108678723 manual Information Connection ESI field for each B-PNC ATM