Lucent Technologies Comcode 108678723 Preparation, Critical reliability/network duplication only

Models: Comcode 108678723

1 230
Download 230 pages 18.93 Kb
Page 76
Image 76

DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

4Upgrading to ATM-PNC

Preparation

4-2

Preparation

Table 4-1 lists the installation items that must be completed and the equipment or materials available before starting the upgrade procedure. We assume that in DEFINITY ECS Release 6.3r or later with ATM-PNC that the ATM switch and interface circuit packs are installed and administered.

Table 4-1. Installation checklist for DEFINITY ECS with ATM installed

 

Component

Description

 

 

 

 

 

 

 

 

Cabinet

Installed and fiber-prepped (fiber pass-through)

 

 

 

 

 

 

 

 

Timing (if

T1 or E1 synchronization splitter installed and stable timing source

 

 

 

needed)

present

 

 

 

 

 

 

 

 

ATM switches

ATM switches installed and fiber connected

 

 

 

 

 

 

 

 

 

ATM interfaces

All ATM interface circuit packs (TN2305/TN2306) installed and

 

 

 

 

 

able to receive and pass on synchronization

 

 

 

 

 

 

 

 

 

Required circuit

All circuit packs required for DEFINITY ECS Release 8 are

 

 

 

packs

 

installed and administered.

 

 

 

 

 

 

 

Critical reliability/network duplication only

 

 

 

 

 

 

 

 

Duplication

2 independent switches or 1 switch with duplicated switch

 

 

 

 

 

fabrics and controls.

 

 

 

 

Independent fiber optic connections between the OC-3/STM-1

 

 

 

 

 

ATM interfaces and each duplicated switch fabric

 

 

 

 

 

 

 

 

Power supply

No one power failure (other than the commercial AC source) able to

 

 

 

 

cause

 

 

 

 

both pairs of switch fabric and controls to simultaneously fail—

 

 

 

 

 

no one power failure (excluding AC source)

 

 

 

 

all interface circuits to fail simultaneously

 

 

 

 

 

 

 

 

Back up power

Back up option (independent of commercial AC source) installed

 

 

 

 

 

 

 

Table 4-2 lists and describes the equipment and materials required for an ATM upgrade.

Page 76
Image 76
Lucent Technologies Comcode 108678723 manual Preparation, Critical reliability/network duplication only