DEFINITY ECS Release 8.2 ATM Installation,

Issue 1

Upgrades, and Administration 555-233-124

April 2000

 

 

1Preparing for Installation and Upgrades

Determine ATM Switch Suitability

1-11

UNKNOWN means that special engineering is required for this application because of the transit traffic. The special treatment is necessary because the feasibility depends on the volume of the transit traffic. Making any of the changes suggested for NO above might make it feasible regardless of the transit traffic.

Table 1-4. Constants

Timeslots per port network

500

 

Cache hit ratio

50%

 

 

 

 

EAL+PACL bandwidth

96

 

 

 

 

Table 1-5. Computed values

Number of nonlocal port networks

13

 

Effective number of port networks for PP

24

 

 

 

 

Effective number of port networks for PMP

24

 

 

 

 

Number of available timeslots

10064

 

 

 

 

Per-port SVCs (PP+PMP) needed

572

 

 

 

 

PP SVCs perPN

3

 

 

 

 

Total PP SVCs

72

 

 

 

 

PP cells per second required over trunks

15158

 

 

 

 

Aggregate cells per second available over trunks

366792

 

 

 

 

Bandwidth-limited maximum phone calls over trunks

2032

 

 

 

 

Timeslot-limited maximum phone calls over trunks

3000

 

 

 

 

Constraint tests

If your calculations do not yield a YES, this section provides the resources of which you are short. These tests check 7 ATM switch resource limitations against 6 different application scenarios. A 1 in the Test Results (Table 1-7) indicates a passed test; a 0 indicates a failed test. To achieve a YES feasibility, all 42 tests must pass. To achieve a PROBABLY, only 21 tests (indicated in bold) must pass.

Page 29
Image 29
Lucent Technologies Comcode 108678723 manual Constraint tests, Constants, Computed values