Installing the UPS System

Installation Checklist

-All packing materials and restraints have been removed from each cabinet.

-Each cabinet in the UPS system is placed in its installed location.

-The front shipping bracket is installed and adjusted, if the cabinet is not installed permanently.

-A cabinet grounding/mounting kit is installed between any cabinets that are bolted together.

-All conduits and cables are properly routed to the UPS and any ancillary cabinets.

-All power cables are properly sized and terminated.

-Neutral conductors are installed or bonded to ground as per requirements.

-Battery cables are terminated on E4 (+) and E5 (-).

-Battery UV trip and Aux contact signal wiring is connected from the UPS to the battery breaker.

-LAN and telephone drops are installed.

-All telephone and LAN connections have been completed.

-A ground conductor is properly installed.

-Air conditioning equipment is installed and operating correctly.

-The area around the installed UPS system is clean and dust-free. (It is recommended that the UPS be installed on a level floor suitable for computer or electronic equipment.)

-Adequate workspace exists around the UPS and other cabinets.

-Adequate lighting is provided around all UPS equipment.

-A 120 Vac service outlet is located within 7.5 meters (25 feet) of the UPS equipment.

-The REPO device is mounted in its installed location and its wiring is terminated inside the UPS cabinet. The REPO switch must be a latching-type switch with a dedicated circuit.

-The normally-closed (NC) Emergency Power-off contact (pins 1 and 2 on TB1) is jumpered if not used.

-Alarm relays and building alarms are wired appropriately. (OPTIONAL)

-A remote battery disconnect control is mounted in its installed location and its wiring is terminated inside the UPS and battery cabinet. (OPTIONAL)

-Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (OPTIONAL)

-The debris shield covering the UPS cabinet ventilation grill is removed.

-Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.

EATON Powerware® 9390 UPS (100–160 kVA) Installation and Operation Manual S 164201604 Rev B powerware.com

3-15

Page 37
Image 37
Powerware 100160 kVA manual Installation Checklist