Installing a Remote Emergency Power-off Switch
13.If you are installing multiple REPO stations, wire additional stations in parallel with the first REPO.
14.If required, install wiring from the REPO station to trip circuitry of upstream protective devices. A
15.When all wiring is complete, reinstall the safety shield panels removed in the previous steps.
16.Close the control panel door and secure with the retained hardware.
17.Reinstall the doors removed in Step 4 and secure with the retained hardware.
18.Close the doors and secure the latch.
EATON Powerware® 9390 UPS |