Installing Options and Accessories
7.Install wiring between the UPS and RMP II. See Drawing
NOTE 120 Vac for the RMP II should be supplied from the critical bus by facility planners or the customer.
8.Install 120 Vac power wiring from the critical bus to the RMP II. See Drawing
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton Customer Service Engineer. Contact service to schedule a date.
9.To check the operation of the RMP II, ensure that the UPS is supplying the load via inverter or bypass. If the indicators on the RMP II show the appropriate status, then it is operating correctly.
If the communication link between the UPS and the RMP II is not present, the RMP II performs a
10.To test the indicator lamps, press and hold the horn silence pushbutton for
3 seconds. All lamps should illuminate, and the horn sounds continuously until you release the pushbutton.
6.4 Installing a Relay Interface Module II
To install RIM II wiring, perform the following procedure:
1.Verify the UPS system is turned off and all power sources are removed. See Chapter 10, “UPS Operating Instructions,” for shutdown instructions.
2.Perform the procedure listed in paragraph 6.1.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not use hollow wall anchors.
3.Securely mount the RIM II at the desired location. See drawing
EATON Powerware® 9390 UPS |