Chapter 3
Installing the UPS System
3.1 Preliminary Installation Information
W A R N I N G
Installation should be performed only by qualified personnel.
Refer to the following while installing the UPS system:
Appendix A contains installation drawings and additional installation notes.
Dimensions are in millimeters and inches.
Do not tilt the cabinets more than 10° during installation.
The conduit landing plates are to be removed to add conduit landing holes as required. Plate material is 16 gauge steel (1.5 mm/0.06″ thick).
The cabinets must be installed on a level floor suitable for computer or electronic equipment.
If perforated floor tiles are required for ventilation, place them in front of the UPS. See Table A on page
Details about control wiring are provided in each procedure for connecting options and features. Drawing
3.2UPS Cabinet Installation
To install a UPS cabinet, perform the procedures in the following paragraphs.
NOTE When a
NOTE When a UPS system is ordered together with battery cabinets for standalone installation, the first battery cabinet is supplied with two cosmetic covers. Additional battery cabinets are supplied without cosmetic covers. Cosmetic covers must be ordered for the UPS cabinet and/or other ancillary cabinets.