Installing Options and Accessories
11.Install parallel system backup control (pull chain) wiring between UPMs. See Drawing
12.Install parallel system backup control (pull chain) wiring between the bypass relay and building alarm 2. See Drawing
NOTE Setup of the Powerware Hot Sync CAN Bridge Card for parallel operation must be performed by an authorized Eaton Customer Service Engineer. Contact service to schedule a date.
13.When all wiring is complete, reinstall the safety shield panels removed in previous steps. Secure with the retained hardware.
14.Close the control panel door and secure with the retained hardware.
15.Reinstall the doors removed previously and secure with the retained hardware.
16.Close the doors and secure the latch.
6.3Installing a Remote Monitor Panel II
To install RMP II wiring, perform the following procedure:
1.Verify the UPS system is turned off and all power sources are removed. See Chapter 10, “UPS Operating Instructions,” for shutdown instructions.
2.Perform the procedure listed in paragraph 6.1.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not use hollow wall anchors.
3.Securely mount the RMP II at the desired location. See drawing
NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the device and the UPS cabinet.
NOTE Remove the UPS cabinet top or bottom conduit landing plate to drill or punch conduit holes (see Drawing
4.Remove the
5.Reinstall the conduit landing plate.
6.Install conduit between the UPS and RMP II. See Appendix A for UPS cabinet and RMP II wiring access information.
EATON Powerware® 9390 UPS |