Powerware 100160 kVA manual +1 and 4+0 Configurations Critical Load

Models: 100160 kVA

1 226
Download 226 pages 24.03 Kb
Page 179
Image 179

Installation Information

 

A

 

 

B

A

 

 

B

 

A

 

 

B

 

A

 

B

 

 

E

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

 

 

*

 

*

 

*

 

*

 

 

*

 

*

 

*

 

 

 

 

 

E1

 

UPM 4

 

E6E

E1

 

UPM 3

E6E

E1

UPM 2

 

E6E

E1

 

UPM 1

E6E

 

 

 

 

E2

 

 

 

7E8

E2

 

 

7E8

E2

 

 

 

7E8

E2

 

 

7E8

 

 

 

 

E3

SEE NOTE 2

E12

E3

SEE NOTE 2

E12

E3

SEE NOTE 2

E12

E3

SEE NOTE 2

E12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K1

 

K5

 

K1

K5

 

K1

 

K5

 

K1

K5

 

 

 

 

 

FUSE FUSE

 

FUSE FUSE

 

FUSE

FUSE

 

FUSE FUSE

 

 

 

 

 

 

RECTIFIER

 

 

RECTIFIER

 

RECTIFIER

 

 

RECTIFIER

 

 

 

 

 

 

 

 

STATIC

 

 

 

STATIC

 

 

 

 

STATIC

 

 

 

STATIC

 

 

 

 

 

 

 

 

SWITCH

 

 

 

SWITCH

 

 

 

 

SWITCH

 

 

 

SWITCH

 

F

 

 

 

 

BATTERY

 

 

BATTERY

 

 

BATTERY

 

 

BATTERY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONVERTER

 

 

CONVERTER

 

 

CONVERTER

 

 

CONVERTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODULE TIE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CABINET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(OPTIONAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MBP

 

 

 

INVERTER

 

 

 

INVERTER

 

 

INVERTER

 

 

 

INVERTER

 

 

 

 

 

 

FUSE

 

 

 

FUSE

 

 

FUSE

 

 

 

 

FUSE

 

 

 

 

 

 

K3

 

 

 

 

K3

 

 

 

K3

 

 

 

 

K3

 

 

 

 

 

 

 

 

C

 

E4. E5

 

 

C

E4. E5

 

 

C

 

E4. E5

 

 

C

E4. E5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BATTERY

 

 

 

BATTERY

 

 

 

 

BATTERY

 

 

 

BATTERY

 

 

 

 

 

 

 

 

BREAKER

 

 

 

BREAKER

 

 

 

 

BREAKER

 

 

 

BREAKER

 

 

 

 

E9

 

 

 

 

E9

 

 

 

E9

 

 

 

 

E9

 

 

 

 

 

 

 

E10

 

 

 

 

E10

 

 

 

E10

 

 

 

 

E10

 

 

 

 

 

 

 

E11

 

BATTERY CABINET

E11

 

BATTERY CABINET

E11

BATTERY CABINET

E11

 

BATTERY CABINET

 

 

 

 

E12

 

E12

 

E12

E12

 

 

 

 

 

 

D

 

 

 

 

D

 

 

 

D

 

 

 

 

D

 

 

MOB 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOB 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOB 3

 

 

 

A --AC Input to UPS Rectifier and Bypass (single-feed) and UPS Rectifier (dual-feed)

 

MOB 4

 

 

 

B --AC Input to UPS Bypass (dual-feed)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C --DC Input from Battery

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D --UPM AC Output to Parallel Tie Point

 

 

 

 

 

 

 

 

 

 

 

 

 

E --AC Input Source

 

 

 

 

 

 

 

 

 

 

 

 

 

MIS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F --System Bypass Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G --Output to Critical Load

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* --Overcurrent Protection Provided by Others

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: 1. UPM and system bypass input feeds

 

TYPICAL PARALLEL SYSTEM

 

 

 

 

 

 

must come from the same source.

(3+1 AND 4+0 CONFIGURATIONS) CRITICAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTPUT TO

 

 

 

 

2. Remove jumper for dual-feed.

 

DESCRIPTION: UPS SYSTEM ONELINE DRAWING

 

 

 

 

 

3. See Note 27 on page A---21 for

 

DRAWING NO:

 

164201604---4

SHEET:

6 of 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REVISION:

 

 

 

 

 

DATE:

 

 

 

 

 

 

 

neutral bonding instructions.

 

 

 

A

 

 

091505

 

 

 

 

EATON Powerware® 9390 UPS (100–160 kVA) Installation and Operation Manual S

164201604 Rev B powerware.com

 

A-11

Page 179
Image 179
Powerware 100160 kVA manual +1 and 4+0 Configurations Critical Load