![](/images/new-backgrounds/1191799/191799377x1.webp)
Installation Information
25.Parallel system UPM and system bypass input feeds must come from the same source.
26.Parallel UPM input wiring size requirements and output wiring size requirements from the UPMs to the tie cabinet or distribution panel are the same as listed in Table E through Table G.
27.If the load requires a neutral, a bypass source neutral must be provided. If the load does not require a neutral and there is no neutral conductor connected at the bypass input, a neutral to ground bonding jumper must be installed. Install neutral conductors from the UPMs to the common point of connection (tie cabinet), and then install a system neutral to ground bonding jumper. If the recommended installation method cannot be accomplished, each UPM should have a separate neutral to ground bonding jumper installed in accordance with Note 7 on page
C A U T I O N
HIGH IMPEDANCE GROUND SOURCES - If the source of supply is a high impedance ground (IT) type, the input neutral conductor must be connected from the source of supply. If there is no output neutral connected to the UPS, the
C A U T I O N
DELTA SOURCES
|
| DESCRIPTION: | POWER WIRING INSTALLATION NOTES |
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
| DRAWING NO: |
|
|
| SHEET: 10 of 15 |
|
|
|
|
| REVISION: B |
| DATE: | 032406 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
| EATON Powerware® 9390 UPS |