
SuperTrak66™ User's Manual | Chapter 5 |
To Stop Rebuild
1)To halt the Rebuild process,
2)The
3)Once "Stop Rebuild" is selected, you will be asked to verify "Cancel Rebuild?"
4)Click "OK" to Stop or "No" to continue Rebuild.
NOTE: You may also start/continue, pause, or stop the process using the Toolbar icons.
Figure 75: Stop Rebuild pull-down
Array Synchronization
Synchronization is a periodic maintenance procedure for Mirroring (RAID 1, 0+1, 3, and 5) arrays to maintain data consistency on all mirrored drives. In operation, array synchronization compares data on the mirrored drives for any differences. If there are differences detected, data from the primary drive(s) is automatically copied to the secondary drive(s). This assures that all mirrored drives will contain the exact information.
NOTE: Users may choose to schedule synchronization during unattended, off
1)To manually synchronize drives from SuperCheck, choose the icon of the mirrored Array in Tree View.
2)
3)You will be returned to the main SuperCheck screen. A progress bar will display at the bottom of the window.
- 94 -