SuperTrak66™ User's Manual | Chapter 5 |
Figure 53: Alert Events & Schedule Synchronization screen
Alert Events
This area (see above) allows you to choose which types of events will generate an email alert and/or report. To do this, highlight a particular event in the “Event” column, then click once in the same row on either the “Email” or “Report” columns to toggle their active states between “Yes” and “No”. The email notification sends email to the alert recipients. The "Report" column affects which events are stored in the Event List on the Message Agent. The Event list may be retrieved by
Schedule Array Synchronization
Array synchronization is a periodic maintenance procedure for mirroring (RAID 1, 0+1, 3, and 5) arrays to maintain data consistency on all mirrored drives. In operation, array synchronization compares data on the mirrored drives for any differences. If there are differences detected, data from the primary drive(s) is automatically copied to the secondary drive(s). This assures that all mirrored drives will contain the exact information.
- 74 -