Operation
Power Supply Operation
Release 3.0 87
Auto-Sequence
Auto Sequence lets you recall a stored program next time the unit is powered on.
(Assumes at least one program has been saved in memory. See “To edit the
sequence’s trigger source:Using Auto Sequencing” on page 96.)
To select Auto Sequence:
Program
Auto
Sequence
The AUTO SEQ PGM menu option is used to set up command programs for
automated operation. There are 10 programmable sequences with up to 99 steps per
sequence.
Each sequence can be repeated a programmable number of times or forever. If the
sequence contains steps that advance by a trigger event, a single trigger source can
be selected to advance those steps.
Each step can be programmed to set the voltage setpoint, current setpoint, power
setoint, and OVP level automatically. Each step can also be programmed to advance
by a delayed time or a trigger event. The duration of each step may range from 10 ms
to 99 hours.
Step # Do This You Will See
1ERROR MSGS
2 2 times1.
1. You can also press the Down arrow 2 times.
PON CONFIG
3 Last Setting
4 3 times2.
2. You can also press the Down arrow 3 times.
Auto Sequence
5 Auto Seq 1
6 or to scroll3,
to select.
3. You can scroll through up to 10 stored programs.
The default display for the selected
operating mode.
MENU
MENU
ENTER
MENU
ENTER
ENTER