Section 2. Installation

Overview

Section 2 provides recommendations and procedures for inspecting, installing, and testing the power supply. For more information about controls and connectors, refer to the front panel diagrams (Figure 1.1 to Figure 1.5) as well as the rear panel diagram (Figure 1.6) in Section 1.

Basic Setup Procedure

Table 2.1 provides a summary of the setup procedure and an overview of the subsections in this chapter. Use this table as a quick reference if you are familiar with the installation requirements for the power supply. If you require more information, each step in the table refers to a subsequent section which contains more details. Complete each step in the sequence given.

Table 2.1 Basic Setup Procedure

Step #

Description

Action

Reference

1

Inspection

Visually inspect the power supply.

“Inspection, Cleaning, and

 

 

 

Packaging” on page 34

2

Installation

Install the power supply, ensuring

“Location, Mounting, and

 

 

adequate ventilation.

Ventilation” on page 37

3

Input Power

Connect AC input power.

“AC Input Power” on page 40

4

Test

Perform functional tests for voltage

“Basic Checks or Self-Tests”

 

 

mode operation, current mode

on page 45

 

 

operation, and front panel controls.

 

5

Select Wires

Select wires that can tolerate the DC

“Load Wiring” on page 48

 

 

current output.

 

6

Connect Load

Connect the load wires to the DC output.

“Load Connections” on page 50

7

Connect Remote

Connect remote sensing connectors on

“Remote Sensing” on page 56

 

Sensing (if required)

power supply to load.

 