2.Reduced air flow — Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised.
3.Mechanical loading — Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading.
4.Circuit overloading — Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
5.Reliable earthing (grounding) — Reliable earthing of
Mounting instructions
1.If the handles are not already installed to the mounting brackets, secure the handles to the brackets with the supplied screws (two per side) (see A on figure 80).
|
| 4 |
1 | Handle uses |
|
| 2 screws. |
|
2 | , 3 |
|
| Bracket uses | 5 |
| 3 screws. |
Figure 80. Rack Mounting the Media Player
2.Remove and retain the three screws installed in both sides of the media player, directly behind the front panel (B).
3.Place the mounting brackets against the left and right sides of the media player, directly behind and flush against the front panel (C).
4.Secure the brackets in place with the screws removed in step 2.
5.Insert the media player into the rack, aligning the holes in the mounting bracket with those in the rack (D).
6.Secure the media player to the rack using standard
JMP 9600 Media Player • Mounting and Maintenance | 101 |