Performance Tests

6.End procedure: Turn off the function generator output and disconnect the function generator.

External CLOCK IN Check

This procedure checks the AWG2005 response to an external CLOCK IN signal.

Electrical Characteristic Checked: Auxiliary Input, CLOCK, Threshold

level, on page21315.

Equipment Required: Two 502Ω coaxial cables, a function generator, and an oscilloscope.

Prerequisites: The AWG2005 meets the prerequisites listed on page 437.

Procedure:

1.￿nstall test hookup and set test equipment controls:

a.Hook up oscilloscope: Connect the AWG2005 CH1 output through a coaxial cable to the oscilloscope CH1 vertical input.

b.Hook up function generator: Connect the AWG2005 rear3panel CLOCK IN through a coaxial cable to the function generator output (see Figure 4319).

Function Generator

FG 5010

AWG2005

Oscilloscope

AWG2005

Figure 4(19:'External CLOCK IN Initial Test Hookup

c.Set oscilloscope controls:

4￿42

Performance Verification