CHAPTER 2

B. Basic Operation Sequences

Operation sequences of the printer are controlled by the microcomputer on the DC controller PCB. Descriptions of each period from ON until the main motor stops are as shown below. See the appendix for timing chart.

Table 2-1-1

 

Period

Purpose

Remark

 

 

 

 

WAIT

From power-ON until the fixing

Warms up the fixing rollers to

During this period, the

(WAIT

roller temperature reaches 170°C .

put the printer in the standby

printer checks if the car-

period)

(Less than 90 sec.)

mode. Cleans the transfer

tridge is installed and if

 

 

charging roller.

there is toner in it.

 

 

 

 

STBY

From the end of the WAIT period

Maintains the printing

If the printer stays in the

(STANDBY)

until a /PRNT signal is input from

temperature of the fixing roller

standby mode for longer

 

the video controller, or from the

so that the printer is ready to

than five hours, it drives

 

end of the LSTR period until a

print.

the main motor for one

 

/PRNT signal is input from the

 

second to rotate the

 

video controller or until the power

 

fixing roller, to prevent it

 

is switched OFF.

 

from deforming.

 

 

 

 

INTR

After the /PRNT signal has been

To stabilize the sensitivity of

 

(INITIAL

input from the video controller

the drum in preparation for

 

ROTATIONS

until the scanner motor becomes

printing and to clean the

 

period)

ready (about 7 seconds).

transfer charging roller.

 

 

 

 

 

PRINT

From the end of the INTR period

To form an image on the

During this period, the

(Print)

until the primary DC voltage

photosensitive drum according

printer maintains the

 

switches OFF.

to the VDO and /VDO signals

printing temperature of

 

 

input from the video controller

the fixing rollers.

 

 

and to transfer the image to

 

 

 

paper.

 

 

 

 

 

LSTR

After the primary DC voltage turns

To deliver the final page and

If a /PRNT signal is input

(LAST

OFF until the main motor stops.

to clean the transfer charging

from the video controller,

ROTATIONS

 

roller.

the INITIAL ROTATIONS

period)

 

 

period begins

 

 

 

immediately.

 

 

 

 

2 - 2

Page 42
Image 42
Canon 3260 manual Period Purpose Remark