Overland Storage REO 9000 with ProtectionPAC Software

2Locate the screw holes in the front and rear rails of the rack where the REO Appliance slides will be installed.

The unit uses 5U of rack space.

Location of rails and mounting hardware

Nut plates,

slide rails, bar nuts, and mounting screws

REO90007

REO90051

3Fasten each outer slide by using 10-32 screws (with washers, if needed) and one nut plate.

22 X Setting Up the REO 9000

Page 22
Image 22
Overland Storage REO 9000 setup guide Unit uses 5U of rack space