
3.9 Async Test | 3 Tests and Diagnostics |
Subtest 06 FIR/SIR Point to Point (send)
NOTE: To execute subtests 06 and 07, each computer must have access to the other computer’s infrared port.
This subtest sends 20h through 7Eh data to the receive side, then receives the sent data and compares it to the original data through the FIR/SIR port.
Subtest 07 FIR/SIR Point to Point (receive)
This subtest is used with subtest 06 described above. This subtest receives the data from the send side, then sends the received data through the FIR/SIR port.
Satellite Pro M10 Series Maintenance Manual |