![](/images/new-backgrounds/1264308/264308719x1.webp)
4 Replacement Procedures | 4.33 TFT FL (Model 15.0 SXGA+ SHARP LQ150F1LH43) |
9.Fold the TCP of the source PCB down.
10.Secure the source PCB with two screws.
11.Fold the TCP of the gate PCB down.
12.Secure the gate PCB with two screws.
TCP of source PCB
Do not grasp both ends.
Do not grasp both ends.
TCP of gate PCB
Figure 4-120 Folding down the PCBs
Satellite Pro M10 Series Maintenance Manual |