
4 Replacement Procedures | 4.34 TFT FL (Model 15.0 UXGA SHARP LQ150U1LW13) |
6.Turn the LCD module upside down.
7.Remove five screws securing the PCBs.
8.Disconnect the FPC.
Screw
Screw
Screw
Screw
FPC
Open the connector cover and disconnect the connector.
Screw
Loosen the screws with 1.0kgf¥cm of torque.
Figure 4-130 Removing five screws and disconnecting the FPC 9. Fold out the PCBs.
Do not grasp both ends.
Do not grasp both ends.
Fold out the PCBs as this illustration.
Figure 4-131 Folding out the PCBs
Satellite Pro M10 Series Maintenance Manual |