9. Maintenance and Checks

9.3 Periodic checks

! CAUTION

1. Pay special attention during the maintenance work to minimize the risk of

 

electrical shock.

2.Turn off power immediately if the T1/T1S or related equipment is emitting smoke or odor. Operation under such situation can cause fire or electrical shock.

Check the T1/T1S based on the following items every six months. Also perform checks when the operating environment is changed.

Item

Check

Criteria

Power supply

Measure the power voltage at the

85 - 132/170 - 264 Vac (AC PS)

 

T1/T1S’s power terminals.

20.4 - 28.8 Vdc (DC PS)

 

Check that the terminal screw is not

Not loose

 

loose.

 

 

Check that the power cable is not

Not damaged

 

damaged.

 

Installation

Check that the unit is installed securely.

Not loose, no play

condition

 

 

 

Check that the option card is inserted

Not loose, no play

 

securely. (if any)

 

 

Check that the expansion rack/unit is

Not loose, no play

 

installed securely. (if any)

 

 

Check that the expansion cable is

Not loose, not damaged

 

connected securely and the cable is not

 

 

damaged. (if any)

 

 

Check that the I/O module on the

Not loose, no play

 

expansion rack is inserted securely. (if

 

 

any)

 

Input/output

Measure the input/output voltage at the

The voltage must be within the

 

T1/T1S’s terminals.

specified range.

 

Check the input status LEDs.

The LED must light normally.

 

Check the output status LEDs.

The LED must light normally.

 

Check that the terminal block is installed

Not loose, no play

 

securely.

 

 

Check that the terminal screw is not

Not loose, not contacting the next

 

loose and the terminal has a sufficient

terminal

 

distance to the next terminal.

 

 

Check that the each I/O wire is not

Not damaged

 

damaged.

 

290 T1/T1S User’s Manual

CTi Automation - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.ctiautomation.net - Email: info@ctiautomation.net

Page 292
Image 292
Toshiba PROSEC T1 T1S, 6F3B0250 user manual Periodic checks