6F3B0250

4. Installation and Wiring

In case of the expansion rack is connected to the T1/T1S, the rack mounting screw is used for this purpose.

Expansion rack

T1

Mounting panel

System ground

·1.25 mm2 (16 AWG) wire should be used to connect the T1/T1S and the expansion rack/unit with the enclosure grounding bus bar.

·100 W or less to ground is required.

Basic Hardware and Function 77

CTi Automation - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.ctiautomation.net - Email: info@ctiautomation.net

Page 79
Image 79
Toshiba 6F3B0250, PROSEC T1 T1S user manual Installation and Wiring