Section 3, Network Turnup Procedure

ATLAS 550 System Manual

 

 

1.INTRODUCTION

This section discusses the installation process for the ATLAS 550 system.

2.TOOLS REQUIRED

The tools required for installation of the ATLAS 550 unit are:

#2 Phillips-head screwdriver

Flat-head screwdriver (for installing modules)

To prevent electrical shock, do not install equipment in a wet location or during a lightning storm.

Electronic modules can be damaged by static electrical discharge. Before handling modules, wear an antistatic discharge wrist strap to prevent damage to electronic components. Place modules in antistatic packing material when transporting or storing. When working on modules, always place them on an approved antistatic mat that is electrically grounded.

3.UNPACK AND INSPECT THE SYSTEM

The ATLAS 550 is shipped in its own cardboard shipping carton. Open the carton carefully and avoid deep penetration into the carton with sharp objects.

After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged in transit, immediately file a claim with the carrier, then contact ADTRAN Customer Service (see the contact information in the front of this manual).

Contents of ADTRAN Shipments

Your ADTRAN shipment includes the following items:

The ATLAS 550 unit

The ATLAS 550 System CD

AC power cord - ADTRAN P/N 3127031 (with AC systems)

19” rackmount brackets and screws

RJ-45 to DB-9 adapter - ADTRAN P/N 3196ADPT001

RJ-45 to DB-25 adapter - ADTRAN P/N 3196ADPT006

Customers must supply the Ethernet cable.