Management and diagnostics modules
13.2Replacing the chassis ID board
Authorized personnel
Authorized specialist personnel can carry out replacement tasks for integral server components. Ask you local Fujitsu service center for more detailed information.
VCAUTION!
Procedures indicated as "Authorized personnel only“ must be done by Fujitsu service personnel or technicians trained by Fujitsu for doing these tasks. Please note that unauthorized interference with the system will void the warranty and exempt the manufacturer from all liability.
13.2.1Required tools
●Starting and completing the task:
–key for the rack doors (if applicable)
–Phillips Ph2 screw driver
●Replacing the chassis ID board:
13.2.2 Starting the task
ÊPerform the following procedures:
1."Opening the rack door" on page 40
2."Shutting down the server" on page 41
3."Sliding the server out of the rack" on page 42
4."Opening the server" on page 44
5.Remove all CPUMEMRs, see "Removing the CPUMEMR" on page 190
IBefore removing the CPUMEMRs, take a note on the installation slot number for each CPUMEMR. Make sure that you reinstall the CPUMEMR in the slot it was located before the replacement.
252 | Maintenance Manual | RX900 S1 |