214 Maintenance Manual RX900 S1
Processors
ÊFasten the heat sink with its five captive screws. Fasten the screws
alternately until they are fully tightened:
Give each screw about 4 turns at a time.
Start with screw 1 to screw 5 as indicated in figure 127 and continue with
screw 1.
Torque: 0.6Nm
10.2.8 Completing the task
ÊPerform the following procedures to complete the task:
1. "Inserting the CPUMEMR in the slot" on page 186
2. "Closing the server" on page 47
3. "Mounting the server in the rack" on page49
4. "Bringing the server back to operation" on page51
5. Enter the BIOS menu and enable the replaced processor.
6. "Closing the rack door" on page51