RX900 S1 Maintenance Manual 73
Power supply
ÊCarefully lower the baseboard in the chassis by using the handle (1).
ÊSlide the baseboard in the direction of the arrow (2) until it clicks into place.
ÊFasten the captive screws (3).
VCAUTION!
Ensure not to damage the EMI springs to comply with applicable EMC
regulations and satisfy cooling requirements and fire protection
measures.
5.4.12 Installing the air guide
Figure 29: Installing the air guide
ÊPlace the air guide in the chassis (1).
ÊFasten the captive screws (2).

/

0 0