Baseboard

14.2.2 Starting the task

ÊPerform the following procedures:

1."Opening the rack door" on page 40

2."Shutting down the server" on page 41

3."Sliding the server out of the rack" on page 42

4."Removing the rear cover" on page 46

5.If required to access the installation place: Remove the expansion cards, see "Expansion cards and BBU" on page 105

IBefore removing the expansion cards, take a note on the installation slot number for each card. Make sure that you reinstall the card in the slot it was located before the replacement.

14.2.3 Inserting the UFM

Figure 164: Preparing the UFM board

Server-specific installation rules are:

Only the nylon screw (1) and the UFM board (2) are used from the available UFM installation kit, see figure 164.

The metal spacer is already installed in the baseboard.

RX900 S1

Maintenance Manual

265

Page 265
Image 265
Fujitsu RX900 S1 manual Inserting the UFM, Preparing the UFM board