314 Maintenance Manual RX900 S1
Cables
15.3.7 Completing the task
ÊPerform the following procedures to complete the task:
1. "Inserting the CPUMEMR in the slot" on page 186
2. "Closing the server" on page 47
3. "Mounting the server in the rack" on page49
4. "Bringing the server back to operation" on page51
5. "Closing the rack door" on page51