Main memory
9.2.6Completing the task
Perform the following procedures to complete the task:
1."Closing the server" on page 47
2."Mounting the server in the rack" on page 49
3."Bringing the server back to operation" on page 51
4."Closing the rack door" on page 51
9.3Installing additional DIMM memory modules
Authorized personnel
Authorized specialist personnel can carry out replacement tasks for integral server components. Ask you local Fujitsu service center for more detailed information.
VCAUTION!
Procedures indicated as "Authorized personnel only“ must be done by Fujitsu service personnel or technicians trained by Fujitsu for doing these tasks. Please note that unauthorized interference with the system will void the warranty and exempt the manufacturer from all liability.
9.3.1Required tools
●Starting and completing the task:
–key for the rack doors (if applicable)
–Phillips Ph2 screw driver
●Installing the DIMM memory module:
RX900 S1 | Maintenance Manual | 191 |