Baseboard

14.5.4 Completing the task

ÊPerform the following procedures to complete the task:

1."Installing the TPM" on page 270

2."Closing the server" on page 47

3."Mounting the server in the rack" on page 49

4."Bringing the server back to operation" on page 51

5."Closing the rack door" on page 51

RX900 S1

Maintenance Manual

275

Page 275
Image 275
Fujitsu RX900 S1 manual Maintenance Manual 275