Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-190

TROUBLESHOOTING & REPAIR

F-190

 

 

 

OUTPUT RECTIFIER BRIDGE REMOVAL AND REPLACEMENT (continued)

FIGURE F.72 – CABLE TIE LOCATIONS

PRIMARY HARNESS ASSEMBLY (BLACK)

SECONDARY HARNESS ASSEMBLY (WHITE)

Return to Section TOC

Return to Master TOC

13.For reassembly, attach the glastic insulat- ed angle mounting pieces to the heat sink first. Slide the bridge into position and then fasten the bottom tab to the sub- frame with the bolt, split-ring lock washer and nut. Then attach and tighten down the top and bottom bolts that hold the heat sink on both sides of the machine.

14.Reconnect the leads on both sides of the bridge. Install new cable ties according to Figure F.72.

15.Install the machine case sides and top.

16.Install the handle and the lift bail rubber gasket.

Return to Section TOC

Return to Master TOC

POWER WAVE 450

Page 250
Image 250
Lincoln Electric SVM112-B service manual Figure F.72 Cable TIE Locations