•Lead #9A between the reconnect switch and switch board #1.
•Lead #9B between the reconnect switch and switch board #2.
•Lead #9C between the reconnect switch and switch board #3.
•Lead #9D between the reconnect switch and switch board #4.
•Lead #9J between the reconnect switch and plug J31 - pin 10 of the protection board.
•Lead #9K between the reconnect switch and plug J31 - pin 14 of the protection board.
•Lead #12A between the reconnect switch and switch board #1.
•Lead #12B between the reconnect switch and switch board #2.
•Lead #12C between the reconnect switch and switch board #3.
•Lead #12D between the reconnect switch and switch board #4.
•Lead #12J between the reconnect switch and plug J31 - pin 12 of the protection board.
•Lead #12K between the reconnect switch and plug J31 - pin 1 of the protection board.
•Lead POS between the reconnect switch and the input rectifier.
•Lead NEG between the reconnect switch and the input rectifier.
8.With the volt/ohmmeter, test THAT THERE IS CONTINUITY between the leads in the following groups according to the voltage for which the machine is wired:
For 200-230 VAC:
A.Test for continuity between leads #9A, #9B, #9C, #9D, #9K, #9J, and POS con- nected together at the reconnect switch.
B.Test for continuity between leads #12A, #12B, #12C, #12D, #12K, #12J, and NEG connected together at the reconnect switch.
For 380 - 460 VAC:
A.Test for continuity between leads #9A, #9B, #9K, and POS connected together at the reconnect switch.
B.Test for continuity between leads #9C, #9D, #9J, #12A, #12B, and #12J connect- ed together at the reconnect switch.
C.Test for continuity between leads #12C, #12D, #12K and NEG connected together at the reconnect switch.
9.If there is continuity within the groups of leads tested, the test is complete. Install the machine case sides, top, handle and the lift bail rubber gasket.