Your system ships as a stand-alone, single server pedestal unit or as a rack unit ready to install in a rack. The pedestal system can also be converted to a rack- mounted server unit using a rack conversion kit (not supplied). You can purchase the kit from your dealer.

The information in this chapter pertains to both configurations. Where differences occur between configurations, they are noted.

Use this chapter to guide you in

selecting a site

unpacking the system

becoming familiar with the system

installing the system

connecting peripherals

connecting power cords

Tpowering on the system

converting the system to a rack-mounted server unit.

Selecting a Site

The system operates reliably in a typical office environment. Choose a site that meetsTthe following requirements.

Install the system near two or more grounded, three-pronged power outlets, preferably on separate electrical circuits.

Note: For the United States and Canada, this means NEMA 5-15R outlets for 100-120 Vac or NEMA 6-15R outlets for 200-240 Vac. For other international sites, this means three-pronged power outlets applicable for the electrical code of the region.

!WARNING

Be sure the power service connection is through a properly

Tgrounded outlet.

The site must be clean, dust-free, and well ventilated. Keep the front and rear ventilation openings free of obstructions and away from sources of heat, vibration, or physical shock.

2-2 Setting Up Your System

Page 22
Image 22
NEC MH4500 manual Selecting a Site, Setting Up Your System