![](/images/backgrounds/275910/275910-267150x1.png)
Adjustment Procedures
Table
Adjustments | Refer to |
|
|
Calibration | Page |
|
|
eference Clock Frequency | Page |
|
|
Marker level | Page |
|
|
Magic Frequency | Page |
|
|
Before doing the adjustments, note the following requirements.
Personnel This procedure is only to be performed by trained service technicians.
Warm%Up Period This waveform generator requires a 20 minute
Self Calibration Calibrate the waveform generator using the self calibration routine. Refer to the Performance Verification section for instructions.
Performance These adjustment procedures require you to load a file from the Performance Check/Adjustments Files Check/Adjustment disk supplied with the waveform generator. Refer to
Adjustment Instructions in this subsection for information about this file.
Test Equipment Table 5±3 lists all test equipment required to adjust the waveform generator.
AWG710 Service Manual |