Preparation for Use

Power On To power on the instrument, push the ON/STBY switch (shown in Figure 2±2) on the lower left side of the front panel. Check that the fan is blowing air out of the instrument.

NOTE. The instrument must be warmed up for at least 20 minutes and the clock calibrated to operate at its optimum accuracy.

ON/STBY switch

Figure 2-2: Location of the ON/STBY switch

2-8

AWG710 Service Manual