TMPR3901F

4.5Bus Arbitration

4.5.1Bus request and bus grant

An external bus master can request that the TMPR3901F grant control of the bus. This is done by asserting the BUSREQ* signal. In response, the TMPR3901F will release the bus and assert a BUSGNT* signal.

If BUSREQ* is asserted, while the TMPR3901F is already engaged in a bus operation cycle, the TMPR3901F will not relinquish the bus until that cycle is completed.

Figure 4-8 shows timing for a bus request and bus grant during which the TMPR3901F relinquishes the bus and an external bus master acquires the bus.

 

 

MPU

MPU cycle

DMA cycle

cycle

SYSCLK

 

 

A[31:2]

 

 

BE[3:0]*

 

 

RD*

 

 

WR*

 

 

BSTART*

 

 

LAST*

 

 

BURST*

 

 

BSTSZ[1:0]

 

 

BUSREQ*

 

 

BUSGNT*

 

 

SNOOP

 

 

Figure 4-8 Bus arbitration

227

Page 238
Image 238
Toshiba TX39 user manual Bus Arbitration, Bus request and bus grant