Diagnostics
↓The switch appears operational.
8
Ensure the power supply is correctly installed and seated in the CTP card. If required, partially remove and reseat the power supply.
Was a corrective action performed?
YES NO
↓Go to step 10.
9
Verify power supply operation.
a.Inspect the power supply and ensure the green LED illuminates.
b.At the Hardware View, observe the graphic representing the power supply and ensure a failure symbol (blinking red and yellow diamond) does not appear.
Is a failure indicated?
YES NO
↓The switch appears operational.
10
A redundant power supply failed and must be removed and replaced. (RRP: Power Supply on page
•This procedure is concurrent and can be performed while the switch is powered on.
•Perform the data collection procedure after FRU removal and replacement.
Did power supply replacement solve the problem?
NO YES
↓The switch appears operational.
Contact the next level of support.
11
At the Product View, does a grey square appear at the alert panel and as the background to the icon representing the switch reporting the problem?
The grey square indicates the HAFM server cannot communicate with the switch because: