Lucent Technologies 555-661-140 manual Powering Up the System

Models: 555-661-140

1 355
Download 355 pages 10 Kb
Page 110
Image 110

MERLIN LEGEND Communications System Release 6.1

Issue 1

Installation 555-661-140

August 1998

Installing the Control Unit

Page 2-45

Powering Up the System

 

 

Powering Up the System

! CAUTION:

Follow the procedure below to power up the system only if the system is completely installed. Failure to comply with this procedure can result in shock hazard or damage to the equipment.

! Turn on the power switch for each expansion carrier: start with the power supply in the rightmost carrier.

The green power lights on each expansion carrier power supply should turn on.

! Turn on the power switch on the basic carrier power supply.

The dot on the one-character display LED flashes.

The green light on the power supply should turn on.

The red light on the processor should turn on for 15 to 45 seconds and then turn off.

All indicators on the 100D and 400EM line/trunk modules (if present) should turn on and then off. They remain off when the modules are idle.

! If any of these conditions are not met, refer to Maintenance and Troubleshooting.

Page 110
Image 110
Lucent Technologies 555-661-140 manual Powering Up the System