Lucent Technologies 555-661-140 manual Powering Up the Telephone after Installing the MFM

Models: 555-661-140

1 355
Download 355 pages 10 Kb
Page 132
Image 132

MERLIN LEGEND Communications System Release 6.1

Issue 1

Installation 555-661-140

August 1998

Installing Telephones and Adjuncts

Page 3-21

Installing Multi-Function Modules

 

 

 

 

 

 

 

 

AC Power

Outlet

Wall Jack

D6AP

Power

Supply

400B2 Adapter D8W

MLX-20L

Home

 

 

 

More

Menu

 

 

 

Inspct

v Volume

1

ABC

DEF

2

3

Feature

Transfer

GHI

JKL

MNO

HFAI

Conf

4

5

6

PQRS

TUV

WXYZ

 

 

Mute

Drop

7

8

9

Speaker

Hold

*

OPER

#

0

 

 

Figure 3-19. Powering Up the Telephone after Installing the MFM

b.Connect one end of the D6AP cord to the 2-conductor (small) modular jack on the 400B or 400B2 adapter, and plug the other end into the modular jack of the 406943837 power supply. The total length of the cords connecting the power supply to the MLX telephone must be less than or equal to 50 ft. (15 m).

! CAUTION:

Do not plug the D6AP cord into the 8-conductor (large) modular jack on the 400B or 400B2 adapter; doing so can cause electrical damage to the control unit and to the telephone.

Page 132
Image 132
Lucent Technologies 555-661-140 manual Powering Up the Telephone after Installing the MFM